|
The pre-sales activities result in the Detailed Project
Proposal. The proposal provides the projected timetables and
key milestones that should be adhered to by all vendors
involved, as well as the user.
The detailed proposal, prepared and delivered by the Compsee
Solutions Consultant should include:
Site Requirement Document
Completed Site Survey
Recommended Hardware Configuration
Application Design Specification
Terminal Image Configuration
Detailed Bill of Materials
Deployment Procedures
Time Line Milestones
Mobility Support Requirements
Project Quotation
Line items that need to be included are charges for the
following:
Hardware Configuration - All Parts and Accessories
Host Software
Terminal Software
Staging
Terminal Image
Loading
Software
Registration
Cellular
Registration
Equipment Testing
Battery Charging
Kitting -
Custom Packaging
and Labeling
Training
Custom
Instructions
On-Site Classes
Installation Services
Network Cabling
Software Installation
System Testing
Mobility Support
Triage
Terminal Replacement
Manufacturer Warranty Repair/Services
Your Vision Portal
|